Back to top

Drilon-Tushemisht Project is discussed on a technical roundtable with Albanian Authorities

On July 24th, 2019, a technical roundtable was organized at AADF Offices to present the draft design for the Drilon-Tushemisht Waterscape Park Project and discuss the challenges the project is encountering. Present into the roundtables were representatives of AADF, architects hired to design the project, representatives from Ministry of Infrastructure and Energy, Ministry of Culture representatives National Agency of Territorial Planning, Ministry of Tourism and Environment, Ministry of Agriculture and Rural Development and Pogradec Municipality. The architects made a presentation of the schematic design and the master plan for the entire area of Drilon-Tushemisht project. AADF is working closely with all relevant authorities at central and local level in order to address at best and provide feedback to all issues raised by the authorities and local communities. The work to detail the project design and the master plan will continue in the coming weeks, and is expected to be completed within fourth quarter of year 2019.